Your browser does not support CSS.
If images appear below, please disregard them.
Directory  |  Library  |  VikingWeb  |  WebMail
Berry College - Experience it Firsthand Longleaf Pine Project
Future Students Berry Students Alumni and Friends Parents and Family Faculty and Staff
Longleaf Pine Project Progress from December 2005- June 2006
1) Hardwood control in core management area (30 acres), clear cut (6 acres) selective cuts (36 acres), and SAVE 2001 area (18 acres) (Arsenal injection/Garlon 4 basal bark spray).
2) Prescribed burn in SAVE 2001 area (18 acres).
3) Planting seedlings in SPB selective-cut #1 (1000 in 10 acres) and SAVE 2001 plots (5000 in 18 acres).
4) Generation of containerized seedlings (3000). – GREW 2000 seedlings.
5) Grafting work in seed orchard – (40 trial grafts)
6) Publication of Mountain Longleaf Conference Proceedings.
hardwood control
prescribed burn
2 month old longleaf pine graft
Maintained by the Berry College Longleaf Team
e-mail: Dr. Martin Cipollini - phone: 706-290-2149
© Copyright 2008, Berry College - 2277 Martha Berry Hwy NW • Mount Berry, GA 30149 • (706) 232 5374